A Calibrated Longshore Transport Model for Richards Bay
In order to plan maintenance dredging at the Port of Richards Bay, different studies were carried out. These were to determine the extreme dredging rates required in the long term and...

An Engineering Evaluation of Fine Sedimentation at the Mayport Naval Basin, Mayport, Florida
The Mayport Naval Basin is located near the mouth of the St Johns River in northeastern Florida, U.S.A. A total of 16.8 million cubic yards of fine sediment were dredged from the harbor...

The Oceanside Experimental Sand Bypass?The Next Step
Following the completion and successful operation of the first phase of the Oceanside Sand Bypass, the next step in the development of the experiment has begun. The Phase I plant is not...

Dredge Spoil and Inner Shelf Investigations off Tauranga Harbour, Bay of Plenty, New Zealand
Dispersion of dredge spoil from an inner shelf dump-mound in 11-17 m water depth, 3 km offshore from Tauranga Harbour, Bay of Plenty, New Zealand, was investigated as part of environmental...

Topographic Responses to the Construction of Large Port Structures on Oarai Coast
Large offshore breakwater and groins have been constructed at Oarai Port, Japan. As a result, the coast experienced significant topographic changes. In this paper, the responses of the...

Noise Control Program for the Boston Harbor Project
A noise control engineering program has been instituted for the Boston Harbor project to make the facility virtually inaudible at the property line. The program integrates the noise mitigation...

Redondo Beach Thermal Study
Thermal tests were conducted in a 3D physical model of Redondo Beach King Harbor to simulate power plant cooling water intake and discharge into the harbor. Tests were conducted to determine...

Investigations on 3-D Flow Structures in Combined Systems of Groynes and Harbour Basins
The structure of the flow field in harbour basins shows significant three-dimensional (3-D) effects, e.g. variation of the direction of the horizontal velocity components with depth, existence...

Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....

Seismic Design Issues for Immersed Tube Tunnels
This paper provides an overview of the issues and the state of the art techniques in the seismic design of immersed tube tunnels (ITT). Particular focus is given to the ITT presently planned...

Immersed Tube Tunnel, Boston, Massachusetts
A four-lane Immersed Tube Tunnel is planned for the crossing of Boston Harbor from the City of Boston to the Logan Airport area in East Boston. The immersed tube consists of 12 sections...

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

Hurricane Hugo One Year Later
Hurricane Hugo, which made landfall on September 21, 1989, was the first serious storm to cross the South Carolina coast in over 30 years. During this period, the coastal areas had grown...

Ductile Frames Are Tough for Earthquakes
Implications of a new structural system in wharf design go far beyond San Francisco Bay, where two such wharves remained intact after the 1989 Loma Prieta quake. The design, introduced...

Seismic Design for Port of Los Angeles, 2020 Program
Due to the Port of Los Angeles' (POLA) importance as a regional hub for transportation and commerce and the potential for a major seismic event in the Southern California...

Identify the Marina User Market and Make the Customer a Part of the Planning Team: Designing and Managing for the User's Needs
A practical surveying method is described which allows a marketing firm to simultaneously - and quantitatively - analyze demographic market composition (for both upland and in-water uses)...

The Marina Environment from a Boaters Point of View
A discussion of the benefits and problems encountered by the recreational boater as a tenant of both the public and private marinas in Southern California is presented....

Encouraging Tourism and Access Through Recreational Marina/Waterfront Design
Encouraging tourism and access through the development of recreational marina facilities challenges a community and marina designer to create a Master Plan which incorporates a wide range...

Development of Marina Facilities on the Southern California Coast
The Southern California coastal region has developed recreational boating facilities through the use of existing bays, creation of new inland water areas and the construction of small...

Structural Investigation of Marina Del Rey Seawall
The Marina del Rey Seawall was constructed by various contractors between 1959 and 1961. It is composed of 660 panels totaling 39,600 linear feet. The seawall configuration is a type normally...

 

 

 

 